Time Cost LLC routinely prepares conceptual/preliminary budgets and hard bid estimates for projects ranging in value up to $300M. We can provide high-accuracy, detailed estimates for all phases of heavy and building construction with emphasis/specialization on site work, dewatering systems, demolition, mass/trench rock excavation, sheeting, slide-rail shoring, cofferdams, shoring/underpinning systems, air ram/casing jacking, timber-concrete-steel piling systems, marine construction, temporary construction systems, drainage, sewer, gas, water utility work, rigging/lift analysis and design, paving, all elements of structural concrete, masonry, structural steel, mechanical, and electrical.
We rely on our long-term development and use of our master proprietary database, used in conjunction with HCSS, which utilizes over 260 (labor, equipment, material) work assemblies and 12k+ bid items to efficiently and accurately price the work. Development of quantity takeoffs, labor, equipment, and material pricing is done by work assembly. Accurate calculations of material waste are assigned through actual experience, vendor recommendations, material type, and particular work operation. The use of time studies is often employed, as required, to verify manpower productivity for self-performed estimated items. Historical data, final accounting, field experience, and time/productivity modeling/studies are then applied, as necessary, to tailored work assemblies to yield final costing.
Using a proprietary bid solicitation system, which includes a database of over 4k subcontractors and material vendors, companies are carefully selected for bidding based on nature, scope, and size of work; their location with respect to the project; and their work on hand, bonding requirements, specialty equipment requirements, past track record, references, M/WBE requirements, and size of workforce.